Bronx Soundview-Bruckner-Bronx River
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
15 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Mar 31, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 5, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | 1) IMMEDIATELY DEMOLISH UNSTABLE REAR PATIO ALONG 1260 MANOR AVENUE.2) ESTABLISH A STABLE EARTH SLOPE BETWEEN THE 1255 STRATFORD AVENUE AND 1260 MANOR AVENUE.3) PROVIDE TEMPORARY STABILIZATION OF THE REMAINING RW ALONG THE 1255 STRATFORD REAR YARD |
| Dec 30, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK/STABILIZATION OF RW. OWNER TO IMMED RETAIN A LIC STRUCTURAL ENGINEER TO PREPARE STABILIZATION,DEMOLITION AND REPAIR PLANS. EMERGENCY STABILIZATION WORK TO BE PERFORMED UNDER PE SUPERV FILE FOR PERMITS WITHIN 48 HRS OF COMMENCING EMERGENCY WORK. WORK TO COMMENCE NO LATER THAN JANUARY 11, 2021 |
| Dec 30, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUEST ADDITIONAL INFORMATION. RESPONDENT IS HEREBY DIRECTED TO IMMED RETAIN A STRUCTURAL ENGINEER AND TO PROVIDE A COMPREHENSIVE STRUCTURAL ENGINEERING ASSESSMENT REPORT OT THE RW UNIT NO LATER THAN JANUARY 30, 2021 |
| Dec 28, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. BUILDING RETAINING WALL AT REAR EXPOSURE # 3 PARTIALLY COLLAPSED INTO NEIGHBORING PROPERTY REAR YARD (1255 STARTFORD AVE) THE COLLAPSED SECTION IS APPROXIMATELY 15'X15' AREA. |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Jan 1, 2009 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 13, 2004 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |