NYC Building Report

Bronx Soundview-Bruckner-Bronx River

1258 Noble Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Nov 24, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 1, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 5, 2020 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 15, 2019 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL-FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATION TO SUBDIVIDE FLOOR (FRON &BACK) CREATED A BATHROOM, WATER CLOSET & (2) BEDROOMS. WATER & WASTE LINES INSTALLED FOR (2) 3 PCS BATHROOMS & (2) RESIDENTIAL SINKS AT KITCHEN AREA'S. GAS LINES INSTALLED FOR FRONT & REAR STOVES. ELECTRICAL WIRE
Nov 13, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 26, 2013 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 13, 2011 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION