Bronx Morrisania
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-02612-0006), so they can include other buildings on the same lot.
224 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Oct 12, 2025 | C | NOV SENT OUT | 2 | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ... IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2026 ADMIN. CODE: REPLACE THE BROKEN OR DEFECTIVE BATHTUB IN THE 2nd BATHROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN IN THE 3rd BATHROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | A | NOV SENT OUT | 2 | § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL THE WATER CLOSET IN THE 3rd BATHROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION DRAIN PIPE UNDER SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 12, 2025 | B | NOV SENT OUT | 2 | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 11, 2025 | C | VIOLATION DISMISSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE NOT FUNCTIONING (LIGHT FIXTURE) AT CEILING (2ND PUBLIC HALLWAY STAIRS) AT PUBLIC HALL STAIRS, 2nd STORY |
| Oct 11, 2025 | C | NOV SENT OUT | 2FL | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | A | NOV SENT OUT | 2.FL | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 21st ROOM FROM EAST, THE 24th ROOM FROM EAST, THE 25th ROOM FROM EAST, THE PRIVATE HALLWAY , THE KITCHEN LOCATED AT APT 2.FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | A | NOV SENT OUT | 2.FL | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2.FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | A | NOV SENT OUT | 2.FL | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2.FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | A | NOV SENT OUT | 2.FL | § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL : IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2.FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | B | NOV SENT OUT | 2.FL | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 21st ROOM FROM EAST LOCATED AT APT 2.FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | B | NOV SENT OUT | 2.FL | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 24th ROOM FROM EAST LOCATED AT APT 2.FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | B | NOV SENT OUT | 2.FL | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2.FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | A | NOV SENT OUT | .2FL | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE 1st BATHROOM FROM EAST LOCATED AT APT .2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | A | NOV SENT OUT | .2FL | § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL : IN THE 1st BATHROOM FROM EAST LOCATED AT APT .2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | C | NOV SENT OUT | .2FL | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT .2FL MID LEVEL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 9, 2025 | A | NOV SENT OUT | .2FL | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE 2nd BATHROOM FROM EAST LOCATED AT APT .2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 8, 2025 | B | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING AT PUBLIC HALL STAIRS |
| Oct 8, 2025 | C | VIOLATION DISMISSED | 2FL | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 7, 2025 | B | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING 1ST PUBLIC HALL |
| Oct 7, 2025 | A | NOV SENT OUT | Not available | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS MISSING |
| Oct 7, 2025 | C | NOV SENT OUT | 2 | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 6, 2025 | B | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 1st STORY |
| Oct 4, 2025 | B | NOV SENT OUT | 1 | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 4, 2025 | A | NOV SENT OUT | 1 | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS MISSING |
| Oct 4, 2025 | C | NOV SENT OUT | 1 | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 4, 2025 | B | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY |
| Oct 4, 2025 | C | VIOLATION CLOSED | Not available | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILINGS ALL STORIES PUBLIC HALL AND PUBLIC HALL STAIRS |
| Oct 1, 2025 | B | NOV SENT OUT | Not available | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 1st STORY |
| Aug 14, 2025 | A | NOV SENT OUT | 2NDFLO | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM EAST, THE 1st BATHROOM FROM EAST, THE 21st ROOM FROM EAST, THE 24th ROOM FROM EAST, THE KITCHEN , THE 12th ROOM FROM EAST, THE 25th ROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 21st ROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT THE EAST WALL AND THE IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | C | NOV SENT OUT | 2NDFLO | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE WOOD WASH BASIN CABINET IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT THE CERAMIC TILES AT NORTH, WEST AND EAST WALLS IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE WOOD WASH BASIN CABINET IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 14, 2025 | B | NOV SENT OUT | 2NDFLO | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |