6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-GARAGE SUSTAINED SEVERE DAMAGE DUE TO FIRE ON 12/31/23 ROOF JOISTS SEVERELY CHARRED.STEEL BEAM @ROOF SAGGING.EXTERIOR WALLS OPEN.OWNR TO ENGAGE NYSPE&CONTRACTR TO DEMO 1STORY STCTURE UNDR PRMT.FILE FOR PRMT BY 1/22/24.COMPLETE BY 3/1/24 |
| Jan 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-BLDG SUSTAINED FIEE DAMAGE ON 12/31/23.SEVERE FIEE DMGNOTED THROUGHOUT,ROOF OPEN.THE REAR WALL MISSING.CHARRED JOISTS @ALL FLOORS@ REAR.OWNR ENGAGE NYSPE &CONTRCTR TO RPR BLDG UNDR PRMT.FILE PRMT BY 1/22/24 & COMPLETE BY 6/1/2024 |
| Jan 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMRGCY WRK-FIRE ON 12/31/23.SEVERE FIRE DMG NOTED @REAR EXTEN&PORCH/ BALCONY.LOSE MATERIAL OBSERVED THROUGHOUT.IMMD INST TIGHT BOARD FNC UNDR DRCT &CONT SUPR OF PE.RMV ALL LOSE MATERIAL IN DNGR OF FALLING FILE PERMIT W/IN 48 HRS STRT WRK |
| Dec 31, 2023 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPX 20 LINEAR FEET OF TIGHT BOARD CONSTRUCTION FENCE @ EXPO#3 REAR TO SAFE GUARD THE PUBLIC AND PROPERTY - ALSO TO PROTECT THE BUILDINGS FROM UNLAWFUL ENTRY |
| Dec 31, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE AND FIRE OPERATION. BUILDING HAS CHARRED BEAMS THROUGHOUT, WINDOWS REMOVED AND ENTIRE BLDG OPEN TO ELEMENTS. REAR SECTION IS ABOUT TO COLLAPSE DUE TO FIRE AND FIRE OPERATION. |
| Dec 31, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REAR GARAGE AFFECTED BY FIRE AT FRONT OF RESIDENTIAL. DAMAGED DUE TO FIRE AND FIRE OPERATIONS |