Bronx Soundview-Bruckner-Bronx River
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 16, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONER'S ORDER #350702(052026FEU20902KR) DATED 05/20/2026 REQUIRING THE BLDG TO BE PERM RPAIRD UNDR PERMIT STRTNG BY 07/06/26 & CMPLTD BY 08/17/26.AS OF 09/16/26,NO RPAIR JOBS HAVE BEEN FILED IN BIS OR DOBNOW.IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #350702 (052026FEU20902KR)DATED 5/20/26 TO PERM RPAIR BLDG UNDR |
| Sep 16, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONER'S ORDER #350702(052026FEU20902KR) DATED 05/20/2026 REQUIRING THE BLDNG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 07/06/2026&CMPLTD BY 08/17/26.AS OF 09/16/26,NO RPAIR JOBS HAVE BEEN FILED IN BIS OR DOBNOW.IMMED COMPLY W/COMMISSIONER'S ORDER #350702 (052026FEU20902KR)DATED 05/20/26 TO PERM RPAIR BLDG UNDR PERMT |
| May 20, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A SAFE CONDITION-BLDG SUSTAINED DAMAGE DUE TO FIRE ON 5/11/26.THE BLDG IS IN A STATE OF DISREPAIR W/FIRE DAMAGED CORNICE/ PARAPET@EXP1,OPEN ROOF,WATER DAMAGE,COLLAPSED CEILNG.OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG&REPAIR UNDER PERMIT.START WORK BY 7/6/26 & COMPLETE SIGN OFF BY 8/17/26 |
| May 20, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-BLDG SUSTAINED DAMAGE DUE TO FIRE ON 5/11/26.THE BLDG IS IN A STATE OF DISREPAIR W/FIRE DAMAGED CORNICE/PARAPET@EXP1, OPEN ROOF,WATER DAMAGE,COLLAPSED CEILNG,WALL FINISH DAMAGE.OWNER TO IMMED RETAIN NYSPE&DOB REG CONT'R TO IMMED:PE TO SBMT MEANS/METHODS FOR EMRG WORK TO FEU |
| May 18, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONER'S ORDER #051526FEY20901KR (CONTROL # 350524),DATED 5/15/26,REQUIRING OWNER TO IMMED SUBMIT MEANS&METHODS FOR APPRVL&PRTLLY DEMO UNSTABLE CORNICE/PARAPET&STBLZE&WEATHERPROOF REMAINING CORNICE/PARAPET,AS REQUIRED;EVALUATE&PROVIDE ADJACENT PROPERTY/PUBLIC PROTECTIOSN,AS REQUIRED;UNDER FLLTME PE SUPERVISION |
| May 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-BLDG SUSTAINED DAMAGE DUE TO FIRE ON 5/11/26.PER DOB RECORDS BLDG IS IN A STATE OF DISREPAOR W/FIRE DAMAGED CORNICE/ PARAPET@EXP1,OPEN ROOF, WATER DAMAGE,COLLAPSE CEILING.FTC #051526FEU20901KR CONTROL#350247.REQUIRING OWNER TO SUB M/M.IMMED COMPLY WITH COMMISSIONER'S ORDER |
| May 15, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ALL FIRE DAMAGED OPENINGS TO SAFEGUARD THE PUBLIC AND PROPERTY |
| May 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT EXTENSIVE FIRE SMOKE AND WATER DAMAGE IN APARTMENT 9 AND APARTMENT 10 ON FIFTH FLOOR OF 5 STORY M/D LARGE SECTION OF ROOF OPEN IN APARTMENTS 9 AND 10. WINDOWS MISSING , METAL CORNICE LOOSE DEFECTIVE IN A STATE OF DISREPAIR DUE TO FIRE APARTMENTS 9AND 10 ON 5 FLOOR ALONG WITH ROOF TO BE VACATED |
| May 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. EXTENSIVE SMOKE FIRE AND WATER DAMAGE TO APARTMENTS 9AND 10 ON 5TH FLOOR LARGE SECTIONS OF ROOF MISSING, WINDOWS MISSING, SKYLIGHT BROKEN DEFECTIVE, METAL CORNICE LOOSE HANGING DEFECTIVE DUE TO FIRE |