Bronx Concourse-Concourse Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC WITH COMMISSIONER'S ORDER CONTROL#348117 VIO#031826PI20402SB DATED 03/18/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/18/26. AS OF 05/15/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348117 VIO#031826PI20402SB |
| Mar 18, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 DETERIORATED MORTAR @ PARAPET. @ EXP2 OBSVD BRICK MASONRY CRACK @ PARAPET. @ EXP3 OBSVD CRACKED BRICK & SEVERAL MISSING BRICKS CAUSING UNSTABLE FACADE NEAR EXP2/3 CORNER. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NY TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN |
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 30, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 20 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE ONE TO SAFEGUARD THE PUBLIC |
| May 27, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN IN A CODE COMPLIANT MANNER OBSERVED DEFECTIVE PARA PET WALL WITH MULTIPLE VERTICAL CRACKS AT ADDRESS RANGE OF 12 THRU 28 EAST 167TH STREET |
| Mar 23, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL ACCESSIBLE OPENINGS TO SECURE AGAINST UNAUTHORIZED ACCESS AND TO SAFEGUARD THE PUBLIC |
| Mar 23, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN-ON 3/22/21,BLDG SUFFER DAMAGE DUE TO FIRE.1/2 BLDG STREET FRONTS-RIVER AVE DMGD/OPEN-DEBRIS IN PUBLIC ROW.ROOF JOISTS EXP 2/3 BURNED-LOST SUPPRT ROOF-SAGGED-OPEN W/MULTIPL HOLES.AT EXP3 WINDOW NO SUPRT.OWNR RETN NYSPE&CONTRCT-EVAL ENTRE BLDG,CLR DEBRIS PUBLC ROW& INTR&RPR BLDG UNDR PRMT.FIL BY 5/1/21.BEGN BY 5/15/21.COMPL BY 9/15/21 |
| Mar 22, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. BUILDING SUSTAINED EXTENSIVE DAMAGE DUE TO FIRE AND FIREFIGHTING OPERATIONS; CONSISTING OF CHARRED WOOD JOISTS, OPEN AND PARTIALLY COLLAPSED ROOF, SMOKE AND WATER DAMAGE. |