14 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.A SECTION OF BRCK MASNRU@EXP1 WAS DISLODGED BETWEEN 5TH&6THFL LVLS OF C LINE APT,&THE FALLEN DEBRIS FROM THAT MASONRY SECTION DMGD THE SDWLK SHED.LINTEL OF APT4C WNDW ON 6THFL.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.NYSPE TO SUBMIT MEANS&METHDS TO TEMP STBLZE THE DISLODGD FACADE&REMVE LOOSE |
| Jun 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.CRCKS WERE OBSVD ON PARAPET WALL@ALL EXPOSURES.AN ANNUAL PARAPET OBSERVATION IS REQUIRED TO BE COMPLETED ANNUALLY STARTING IN 2024.SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 07/13/26 |
| Jun 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.AT EXP1 FACADE,SECTIONS OF BRCK MASONRY WERE LOOSE,DISLODGED,&CRCKD.PARAPET WALLS@ALL EXPS HAD CRCKS.CRCKS&SAGGNG CEILNGS WERE OBSVD IN APTS A,B,C,&D LINES.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 8/10/26 |
| Jun 29, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: REPAIR AN APPROXIMATE TOTAL OF 8'LINEAR FEET IN WIDTH BY 11' FEET IN DEPTH OF SIDEWALK SHED EXPOSURE 1 (FULTON AVENUE) IN ORDER TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Jun 29, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: ERECT TIGHT BOARD FENCE TOTAL OF APPROX. 20' AS FOLLOWS EXPOSURE #1 (FULTON AVENUE), LEFT SIDE OF DOORWAY APARTMENT WN TO CORNER OF MAIN ENTRANCE COURTYARD 8' LINER FEET AT FRONT OF BUILDING WITH A 6' FOOT PROJECTION FROM BUILDING |
| Jun 8, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. ATOI OBSERVED WINDO W SILL AND BRICK FALLEN FROM APT 4C ONTO SIDEWALK WITH REMAINING MASON RY IN DANGER OF FALLING REMEDY: SUBMIT ENGINEER'S REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV E VALUATING CONDS W/PLANS, PICS, TIMEFRAME FOR REPAIRS W/IN 72 HRS |
| Jun 8, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: INSTALL APPROXIMATELY 70 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 1 INSTALL APPROXIMATELY 20 X 10 LINEAR FEET OF SIDEWALK SHED YARD (FRONT ENTRANCE) OF BUILDING |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 9, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 17, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |