Bronx Concourse-Concourse Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
32 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 27, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 27, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 27, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 27, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 29, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 4, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:3 COMBINED BLDGS ON SAME LOT.BUILDING HAS BEEN APPROX 90% DEMOLISHED WITH PARTL EXP3 WALL+ENTIRE EXP4 WALL REMAINING SLAB ON GRADE REMAIN.REMAIN BUILDING UNSTBLE.OWNR TO RETN NYSPE &LIC'D CONTR OR ENDORSE FOR DEMO-INSTL PBLC/ADJ PROP PROTCT AS REQ.FULLY DEMO BLDG HAND.WRK UNDR PE.FILE W/IN 2DAY.STRT BY 8/9/21.PE SUBM MEANS+MTHD |
| Aug 4, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:3 COMBINED BUILDINGS ON SAME LOT.ROOF PARTIALLY COLLAPSED AND OPEN.1ST FLOOR DETERIORATED+PARTIALLY COLLAPSD.EXPOSURES 1,2,3,4 WALLS UNBRCD.BULDING UNSTBLE.OWNR-RETN NYSPE&CONTR ENDORSE FOR DEMO-INSTL PBLC/ADJ PROP PROT AS REQ.FULLY DEMO BLDG BY HAND.WRK UNDR SUPV/DIRCT OF NYSPE.FILE W/IN 2 DAY.STRT BY 8/9/21.SUBM MEANS+METHODS |
| Aug 4, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:3 COMBINED BLDGS ON SAME LOT.ROOF HAS BEEN REMOVD WITH A FEW REMAINING ROOF JOIST +FREE STANDING 2ND FLR WALLS.EXP4 BULG OUT.1ST&2FL FRMG PRTLY COLPSD.BLDG UNSTBLE.OWNR-RETN NYSPE+LIC'D CONTR ENDORSE-DEMO-INSTL PUBLC/ADJ PROPTY PROTCT,FULLY DEMO BLDG BY HAND.WRK SUPV/DIRCT ONSITE PE.FILE W/IN 2 DAYS.PROV MEANS+MTHODS.STRT BY 8/9/21 |
| Jun 9, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 14, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 6, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 3, 2020 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Aug 3, 2020 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Aug 3, 2020 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jun 26, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:1 STRY WD FRAME SEMI ATTACH GARAGE IN STATE DISREPAIR.DETERIORATED AND LOOSE SIDING OBSERVED @FRONT WALL.DETERIORATED ROOFING&EXCESSIVELY SAGGING ROOF FRAMG NOTED THRU-OUT.CONDITIONS HAVE RENDERED BLDG UNSAFE TO OCCUPY.IMMEDIATELY VACATE ENTIRE BLDG UNTIL UNSAFE CONDITIONS ARE REMEDIED.REPAIR BLDG UNDER PERMIT.START WORK BY 10/15/20 |
| Jun 26, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:1 STRY+C ATTCH WD FRAME VACANT BLD STATE OF DISREPAIR.DETERIOR AND LOOSE SIDING NOTED@FRNT WALL.DETERIOR ROOF & EXCESSIVE SAGGING OF ROOF FRAMING NOTED THR-OUT.THE 2 STORY EXTENSION IS LEANING.BLDG IS UNSAFE TO OCCUPY.IMMEDIATELY VACATE ENTIRE BLDG UNTIL UNSAFE CONDITIONS HAVE BEEN REMEDIED.REPAIR BLDG UNDER PERMIT.START WORK BY 10/15/20 |
| Jun 26, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:2 STRY+C SEMI ATTACHED WD FRAME VACANT BLDG STATE DISREPAIR.RACKED WINDOW FRAMES NOTED@FRONT WALL.NORTH WALL IS LEAN&MISSING SIDING NOTED THR-OUT.ROOFING HAS DETERIORATED&EXCESSIVE SAGGING ROOF FRAMG OBS.BLDG IS NOT SAFE OCCUPY.IMMEDIATELY VACATE ENTRE BLDG TIL UNSAFE CONDITIONS HAVE BEEN REMEDIED.REPAIR BLDG UNDER PERMIT.START WORK BY 10/15/20 |
| Mar 4, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 9, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 30, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 7, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 29, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 3, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 6, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 9, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 31, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 3, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 22, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 11, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |