NYC Building Report

Bronx Highbridge

1082 Woodycrest Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

10 records

Date Status Type Summary
Dec 1, 2022 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Aug 2, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Jun 1, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Oct 17, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 31, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 1, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADDT'L INFORMATION. BASED ON FINDING OF THE DOB INVESTIGATION EOR MR PAUL BAILEYS PERFORMED STRUCTURAL DWGS. AT TIME OF REVIEWING THE DWGS,OBSERVED (1)TRANSER BEAM TO SUPPORT SW.2 @2FL IS MISSING(2) SPANDREL MISSING(3)DEATAILS CALLED OUT ON PLANS ARE MISSING. REMEDY: STOP ALL STRUCTURAL WORK. COMPLY WITH CODE
Aug 7, 2018 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 7, 2018 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 7, 2018 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 16, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE ALL REQUIRED INFORMATION FOR APPLICATIN #220589227 DUE TO WITHDRAWAL OF SUPERINTENDENT OF CONSTRUCTION STOP ALL WORK PROVIDE ALL REQUIRED INFORMATION