Bronx Morrisania
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 29, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 29, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 29, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 8, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROX. 50 LINEAR FEET OF FENCE ALONG EXP#1 TO SAFEGUARD THE PUBLIC AND PREVENT ANY UNAUTHORIZED ACCESS |
| Mar 5, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:BLDG WAS DMG BY 3-ALARM FIRE ON 3/5/19 UNDER COMMISH ORDER DATED 3/5/19 BLDG WAS PART DEMOD STABL&SEALED PORT OF WALL&FLOOR FRAM THAT REMAINS ARE FIRE DAMG BLDG NOT SUITABLE FOR HABITATION OWN TO HIRE NYS LIC PE/RA TO EVAL ENTIRE BLDG&DEVELOP COMPREHENSIVE REPAIR PLANS FILE REPAIR PLANS 7/1/19 BEGIN WORK BY 7/15/19 COMPLETE WORK BY 4/1/20 |
| Mar 5, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK:BLDG DMG IN FIRE ON 3/5/19 ROOF FRAM FIRE DMG&COLLAP ONTO ATTIC FL FRAM@EXT OF EXP4 SHEAT&SIDING FULLY PENETRAT&COLLAP INTO SIDE YARD&ADJ LOT CHIM@EXP4 PART COLLAP@TOP OWN RET PE&CONT ENDORS FOR DEMO EVAL STRUC&PERF PART DEMO&STAB TO SAFE LEVEL ALL DEMO&SHOR WRK SUPV BY ONSITE PE&PROV DAILY RPTS BY 3/7/19 WRK BEG 3/11/19 FILE WRK 2 BUS DAY |
| Mar 5, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | .DUE TO FIRE |