Bronx Highbridge
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-02527-0061), so they can include other buildings on the same lot.
2286 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Dec 15, 2023 | C | VIOLATION CLOSED | 3L | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Dec 15, 2023 | C | VIOLATION CLOSED | 3L | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Dec 15, 2023 | C | VIOLATION CLOSED | 3L | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Dec 15, 2023 | C | VIOLATION CLOSED | 3L | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Dec 9, 2023 | B | VIOLATION DISMISSED | 3L | § 27-2005 HMC: REFIT LOWER SASH WINDOW AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Dec 9, 2023 | C | VIOLATION DISMISSED | 3L | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Dec 9, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BROKEN FRAME AT BUILDING ENTRANCE DOOR , 1st STORY |
| Dec 5, 2023 | C | VIOLATION CLOSED | 5L | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| May 17, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Mar 31, 2023 | B | VIOLATION CLOSED | 6M | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 6L | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 6G | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Mar 31, 2023 | B | VIOLATION CLOSED | 6D | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 5S | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5S, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Mar 31, 2023 | B | VIOLATION CLOSED | 5R | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 5M | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5M, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 5L | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5L, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 4J | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Mar 31, 2023 | B | NOV SENT OUT | 3N | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Mar 31, 2023 | B | VIOLATION CLOSED | 3D | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 3C | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 31, 2023 | B | VIOLATION CLOSED | 2S | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Mar 31, 2023 | B | VIOLATION CLOSED | 2R | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 31, 2023 | B | NOV SENT OUT | 1C | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 23, 2023 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 4G | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''A'', 1st FROM WEST AT NORTHWEST |
| Mar 23, 2023 | A | VIOLATION DISMISSED | 4G | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''A'', 1st FROM WEST AT NORTHWEST |
| Mar 23, 2023 | A | VIOLATION DISMISSED | 2P | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE 2nd ROOM FROM EAST, THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 6S | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6S, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | NOV SENT OUT | 6P | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6P, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 6K | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6K, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 6H | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A'', 1st FROM WEST AT NORTHWEST |
| Mar 23, 2023 | B | VIOLATION CLOSED | 6B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''B'', 1st FROM NORTH AT NORTHEAST |
| Mar 23, 2023 | B | VIOLATION CLOSED | 6A | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''B'', 1st FROM NORTH AT NORTHEAST |
| Mar 23, 2023 | B | NOV SENT OUT | 5P | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5P, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 5N | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5N, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 5K | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5K, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 5H | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A'', 1st FROM WEST AT NORTHWEST |
| Mar 23, 2023 | B | VIOLATION CLOSED | 4S | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4S, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 4M | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 4L | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 4G | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''A'', 1st FROM WEST AT NORTHWEST |
| Mar 23, 2023 | B | VIOLATION CLOSED | 4E | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A'', 1st FROM WEST AT NORTHWEST |
| Mar 23, 2023 | B | VIOLATION CLOSED | 4A | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''B'', 1st FROM NORTH AT NORTHEAST |
| Mar 23, 2023 | B | VIOLATION CLOSED | 3P | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3P, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 3M | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3M, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | VIOLATION CLOSED | 3K | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | B | NOV SENT OUT | 3E | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A'', 1st FROM WEST AT NORTHWEST |
| Mar 23, 2023 | B | VIOLATION CLOSED | 2P | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | C | VIOLATION DISMISSED | 2P | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |
| Mar 23, 2023 | C | VIOLATION DISMISSED | 2P | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTH |