Bronx Morris Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT; NOTED AT BASEMENT ERECTED FULL HEIGHT PARTITIONS AND DOORS TO CREATE BATHROOM, AND 2 ADDITIONAL ROOMS. INSTALLED ADDITIONAL ELECTRICAL LINES FOR LIGHT, SWITCHES, AND OUTLETS. INSTALLED WATER AND WASTE LINES FOR 3-PIECE BATHROOM (TOILET, SINK, TUB) AND RESIDENTIAL SINK. INSTALLED GAS LINE FOR STOVE. |
| Jul 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | RESIDENCE ALTERED; NOTED OFFICIAL BUILDING DEPARTMENT RECORDS INDICATES BUILDING AS 2 STORY 2 FAMILY, BASEMENT AS ORDINARY. ALTERATION NOTED AT BASEMENT LEVEL NOW SET-UP AND ARRANGED AS A CLASS A APARTMENT, WITH A 3-PIECE BATHROOM, KITCHEN WITH A RESIDENTIAL SINK, GAS STOVE, AND 2 BEDROOMS. |