Bronx University Heights (South)-Morris Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 4, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 18, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.1 STRY+CELLAR MASONRY WALLS W/WOOD FRAMED ROOF IN DISREPAIR.THE PARAPET OF FRONT WALL PART COLL.REMAIN OF PARAPET AT RISK OF FURTHER COLL.ROOF FRAMING APPEARS TO HAVE SUSTAIN FIRE DAMAGE SOMETIME IN THE PAST.REMEDY:OWN ENGAGE NYS LIC PE&CONT'R EVAL BLDG&PREP RPR PLANS& DETAILS.OBTAIN PERM FOR RPR WRK NO LATER 2/1/18.START WRK BY 2/15/18 |
| Jan 12, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK.PARAPET WALL AT FRONT OF BLDG HAS PART COLL.REMAIN OF WALL IS FREE STANDING.IMPROPERLY BRACED&AT RISK OF FURTH COLL.REMEDY:OWN TO IMMED ENGAGE PROF ENG'R PE&CONT'R TO EVAL&DEMO/BRACE PARAPET WALL ERECT FENCE AT EXP 1 TO PROTECT PUBLIC.PART REMOVAL OF AWNING AT FRONT OF BLDG.FILE PERMS W/48HRS OF COMMENCEMENT OF WORK |
| Jan 12, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO COLLAPSED OF PARAPET WALL |
| Dec 3, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 11, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN INTERIOR OF BUILDING. DEFECT: AT CELLAR FLOOR JOIST BETWEEN CELLAR & 1ST FLOOR HAS ROTTED AND DETERIORATED. ROTTED JOIST ARE AT REAR OF STORE EXPOSURE 2 & 3 REAR |